Post

Replies

Boosts

Views

Activity

4. 2 Design: Minimum Functionality, invalid for 2 months
As a practical tool, the review was repeatedly rejected, and after numerous modifications during the period, it was still invalid. The review team was contacted but it did not have any substantial effect. Already tossed crazy, in reference to the review guide and applications based on similar ideas, we have made more functional features and technical adaptations. What should I do to abandon the whole project?
7
0
4.0k
Mar ’20